Skip to content

BICS applications open: what small manufacturers should prepare

Pen-and-ink illustration of two small manufacturing colleagues reviewing blank paperwork in a workshop, with a small Union Jack as the only coloured detail

Small manufacturers in England, Scotland and Wales can now apply for electricity-cost relief through the British Industrial Competitiveness Scheme (BICS). The first application window opened on 1 October and closes on 30 November 2026. For an owner juggling production and paperwork, the useful next step is to check eligibility and start assembling the evidence well before that deadline.

Applications are open, with savings due next year

The government’s 1 October announcement says more than 10,000 businesses could benefit, with electricity bills reduced by up to 25%. The actual percentage will vary with the price a business pays. This is targeted manufacturing support, rather than a discount for every small business.

BritishSME covered the earlier expansion of the scheme in April. Today’s development moves the decision from watching the plans to preparing an application.

The official timetable puts eligibility decisions in January 2027. Relief from Renewables Obligation and Feed-in Tariff costs is expected from April 2027, with Capacity Market relief following in October. Those are particular electricity policy charges; an exemption does not remove the whole bill.

Check your company, products and premises

The official scheme page sets out four tests: Companies House registration, an eligible business sector, an eligible manufactured product and sufficient electricity use. Sector eligibility uses Standard Industrial Classification (SIC) codes; products use Harmonised System (HS) codes. Being a supplier to an eligible industry does not, by itself, settle whether your own activity qualifies.

The applicant guidance sets a minimum of 33 megawatt-hours of annual grid electricity use at the manufacturing site. For mixed production, it gives no exemption where eligible manufacturing accounts for 25% or less of grid electricity. Check the units on your records carefully and use the official rules for the evidence period, rather than relying on a rough annual bill total.

The government eligibility checker asks for the company number, site postcodes, products and electricity information. It considers individual sites and gives an indication, rather than an award decision. Its current wording also retains a caveat about the necessary legislation, so a favourable check should not be treated as approval.

Build a clear evidence folder

Use the official evidence checklist to organise the documents. It calls for electricity records covering the latest available six consecutive months within the preceding year, identifying the supply address, meter reference, supplier, billing period and consumption.

Production evidence matters too. The checklist gives examples such as manufacturing logs and quality-control records linked to batches; sales or purchase notes alone do not demonstrate that production happened. Choose records that someone unfamiliar with your workshop can follow, and explain the connection between the products, the site and the power used.

If a landlord or another business bills you for electricity, ask early for the relevant invoices and an explanation of how consumption is allocated. Check which documents you already hold and which need another person’s help. A short list of missing items is easier to chase than a last-minute search through several inboxes.

Review the application before submitting

The applicant guidance allows one application per legal entity each year, covering multiple sites, and says submitted applications cannot be amended. The closing time is 11:59pm on 30 November.

That makes an internal review sensible. Ask the person who knows the production process to check the operational explanation, while whoever manages the bills checks the meter references and figures. Resolve differences before submission. A mixed-production site or unusual supply arrangement deserves a careful reading of the relevant guidance, with professional advice if you cannot establish the correct treatment.

Keep the potential saving separate from today’s budget

The launch announcement also promises eligible businesses an additional payment equivalent to around a year’s relief, available only to those applying during 2026. It does not justify assuming a particular payment amount or arrival date for your business.

Continue budgeting for existing electricity costs until eligibility and the effect on your bills are clear. Start from the official scheme page for current application information, assign someone to gather the records, and set an earlier internal deadline. The opportunity is worth checking; the immediate task is a complete, accurate application.

Sources

  • GOV.UK: BICS application-opening announcement, 1 October 2026.
  • GOV.UK: scheme collection, applicant guidance and eligibility checker, reviewed 1 October 2026.
  • GOV.UK: Annex A evidence requirements, reviewed 1 October 2026.